Air conditioning repair in Burnaby
Request cooling-system assessment in Burnaby offices and strata properties, with shared-equipment responsibility and building access clarified.
Request Service
Map the complaint to the correct system.
For a Burnaby office campus or strata property, identify whether cooling is provided by a tenant unit, a rooftop package or common building equipment. If several areas are affected, list them and provide the facilities or strata contact.
Explain whether the symptom is low airflow, warm air or a complete shutdown and when it happens during occupancy. Mechanical-room and roof access may have separate authorization processes. Share known equipment information so the relevant specialist and access requirements can be reviewed together.
Problems to describe
- Air moves but the space does not cool
- Cooling is inconsistent between occupied areas
- The system shuts down or displays a fault
What the assessment covers
A review begins with the system type, operating symptoms and access. Split systems, packaged rooftop units and shared building equipment may need different specialists and permissions.
Useful details and photos
- Equipment model and system type, if known
- Hours when the issue occurs
- Building contact for shared systems or roof access
Scope and practical limits
Refrigerant and electrical work require appropriate qualifications. Roof access, parts and building approvals affect feasibility; do not open equipment or handle refrigerant components.
Pricing, any assessment fee and work authorization are agreed before service. For several properties, include a site reference and on-site contact for each request.
Multi-location repair coordination →Air conditioning repair: common questions
Can you service a rooftop cooling unit?+
Include the unit details and existing roof-access arrangements. Specialist availability, weather and safe access are confirmed before a visit.
What if my unit is part of a shared system?+
Identify the property manager or strata contact and explain whether other units are affected. Shared equipment may require building authorization.
